You are here: HomeLatest News

Latest News

Late Availability

Keep checking throughout the season for late availability

Winter upgrade

The yacht is constantly being upgraded, the programme past, present and future is detailed below:

 

2014

The yacht went through a major refit in 2014 in preparation for it's trip to the Caribbean. The keel was removed and the hull extensively strengthened especially below the mast step. The insides were removed and new frames and fibreglass added including 2 layers of kevlar. This has made the yacht very strong and rigid which in turn has increased the performance. During the refit new water tanks and plumbing was installed and the yacht was completely re-wired with a mastervolt electrical system installed. The yacht has many fuses and switches installed from the batteries right through to appliances The refit also included new equipment, hydrogenerator, solar panels, computer, tv, satphone, biminis and sails

 

2016

The winter programme for 2015/16 included the installation of a new windlass and new saloon windows.

 

2017

A new heating system which includes 2 Eberspacher Airtronic heaters, which will keep the boat very warm on cold days, anchor wash system and varnishing being the main tasks.

 

2018

A new composite cockpit deck and all the safety lines replaced. New saloon cushions.

 

2019

Composite decking extended to all the decking, coachroof upgraded including new cockpit cover. Mattress covers renewed.

 

2020

Topsides and mast/boom repainted